Gold Mining Products Stone Belt Modular CZPT Use for Mineral
Operating Principle
The equipment is quick for “sidewall device” or “higher inclination angle belt conveyor”, with the rewards of easy composition, reputable procedure, and hassle-free maintenance of common conveyor, and the features of higher inclination angle conveying, compact construction, considerably less land occupation, is the perfect products for large inclination angle conveying (even for vertical conveying).
Characteristics
The optimum inclination angle can be up to 90°, it is the excellent tools of the higher inclination angle conveying and vertical lifting, which saves land occupation, gear expense and building cost, as a result obtain a great comprehensive financial gain.
Composition is easy, all major elements are CZPT for general belt conveyor, which is practical for operation and maintenance.
CZPT procedure, no chain-block, chain-floating, chain-scission phenomena of buried scraper conveyor and skid, bucket-off phenomena of bucket elevator.
Stable operation and reduced noise.
As there is no digging resistance of loading, the inner&external friction and the power intake is low.
Horizontal conveying area of any size can be established at the begin and end part of vertical sidewall machine, which is convenient for the connection with other equipment.
Application Scope
Corrugated sidewall belt conveyor is 1 of the most typically employed mining equipment, which is widely utilised in mineral processing, design resources, silicate and chemical industries. In the production of little scale, medium scale or big scale mineral processing Crops, it is typically employed as the tranportation device tfor metallic ores of gold, silver, copper, guide, zinc, nickel, manganese, iron, molybdenum , chromium, tin and other folks, as effectively as stone, rock, granite, limestone, barite, quartz, graphite, feldspar, fluorspar, coal, and so on.
Conveying capability Qv beneath numerous parameters although belt pace is 1m/s
Small Measurement
Belt Width (mm) |
five hundred | 650 | |||||||||||||
Sidewall Top (mm) |
80 | one hundred twenty | a hundred and sixty | eighty | a hundred and twenty | 160 | |||||||||
Compartment Distance (mm) |
126 | 252 | 126 | 252 | 378 | 252 | 378 | 126 | 252 | 126 | 252 | 378 | 252 | 378 | |
Elevation Angle | 30° | 39 | 21 | – | 52 | 34 | sixty five | forty five | 59 | 32 | – | seventy eight | fifty two | one hundred and five | 73 |
40° | 31 | sixteen | – | forty | 26 | 52 | 34 | 47 | 24 | – | sixty | 40 | eighty five | 56 | |
50° | 25 | thirteen | 60 | 32 | – | forty two | 27 | 37 | 19 | ninety | 48 | – | sixty eight | 45 | |
60° | 20 | eleven | 50 | 26 | – | 34 | 23 | 31 | 16 | 75 | 39 | – | fifty five | 36 | |
70° | 17 | – | forty one | 21 | – | 28 | eighteen | 25 | – | sixty two | 32 | – | 45 | 30 | |
90° | ten | – | 25 | – | – | 17 | – | 15 | – | 38 | – | – | 28 | – |
Large Dimensions
Belt Width (mm) |
800 | 1000 | |||||||||||||||
Sidewall Top (mm) |
a hundred and twenty | a hundred and sixty | 200 | one hundred sixty | two hundred | 240 | |||||||||||
Compartment Distance (mm) |
126 | 252 | 378 | 252 | 378 | 252 | 378 | 504 | 252 | 378 | 252 | 378 | 504 | 252 | 378 | 504 | |
Elevation Angle | 30° | – | ninety nine | 65 | 136 | 94 | – | 148 | 113 | 186 | 129 | – | 207 | 159 | – | 283 | 229 |
40° | – | seventy six | fifty | one hundred ten | 72 | – | 114 | 87 | a hundred and fifty | 99 | – | one hundred sixty | 122 | – | 231 | 176 | |
50° | 113 | sixty | – | 88 | 58 | 139 | 91 | – | one hundred twenty | 79 | 195 | 128 | – | – | 185 | 141 | |
60° | ninety five | 49 | – | 72 | 47 | 113 | seventy four | – | ninety eight | 64 | 159 | one zero five | – | 229 | 151 | – | |
70° | 77 | forty | – | fifty eight | 38 | ninety two | sixty one | – | 80 | fifty two | a hundred thirty | 85 | – | 187 | 123 | – | |
90° | forty seven | – | – | 36 | – | 57 | 37 | – | forty nine | – | 80 | fifty two | – | a hundred and fifteen | 76 | – |
Allowable Max. Particle Dimension and Max. Velocity with Different Belt Widths, Guard Side
Modest Dimensions
Belt Width (mm) |
500 | 650 | ||||||
Sidewall Top (mm) |
80 | 120 | 160 | 80 | one hundred twenty | a hundred and sixty | ||
Elevation Angle
|
30° | Max. Belt Speed (m/s) | two | 2 | two | one.six | two | two |
Max. Particle Dimension (mm) | one hundred | 120 | 120 | 100 | a hundred and forty | 160 | ||
40° | Max. Belt Velocity (m/s) | two | two | two | 1.6 | two | two | |
Max. Particle Size (mm) | a hundred | 120 | one hundred twenty | a hundred | a hundred and forty | one hundred sixty | ||
50° | Max. Belt Speed (m/s) | 1.six | one.6 | one.6 | one.6 | one.6 | one.6 | |
Max. Particle Size (mm) | eighty | 120 | a hundred and forty | 80 | one hundred twenty | 140 | ||
60° | Max. Belt Pace (m/s) | 1.six | one.6 | 1.6 | 1.six | 1.six | 1.6 | |
Max. Particle Size (mm) | 80 | 120 | a hundred and forty | 80 | a hundred and twenty | 140 | ||
70° | Max. Belt Pace (m/s) | one.twenty five | 1.twenty five | 1.twenty five | one.twenty five | 1.twenty five | one.25 | |
Max. Particle Dimensions (mm) | 50 | sixty | a hundred | 50 | 60 | one hundred | ||
90° | Max. Belt Pace (m/s) | 1. | one. | 1. | one.25 | 1.25 | 1.twenty five | |
Max. Particle Dimensions (mm) | 50 | sixty | eighty | fifty | sixty | eighty |
Big Dimension
Belt Width (mm) |
800 | 1000 | ||||||
Sidewall Top (mm) |
120 | a hundred and sixty | two hundred | 160 | two hundred | 240 | ||
Elevation Angle
|
30° | Max. Belt Pace (m/s) | two | two.5 | two.5 | 2.5 | 2.five | two.five |
Max. Particle Dimension (mm) | a hundred and forty | a hundred and eighty | two hundred | 180 | 250 | 280 | ||
40° | Max. Belt Speed (m/s) | 2 | two | two | two | 2 | two.5 | |
Max. Particle Size (mm) | 140 | 180 | two hundred | a hundred and eighty | 250 | 250 | ||
50° | Max. Belt Speed (m/s) | 1.6 | 1.6 | 1.six | 1.six | one.six | 2 | |
Max. Particle Measurement (mm) | one hundred twenty | a hundred and forty | 180 | a hundred and forty | one hundred eighty | 220 | ||
60° | Max. Belt Velocity (m/s) | 1.6 | 1.6 | one.6 | 1.six | 1.six | 1.six | |
Max. Particle Dimension (mm) | 120 | 140 | 180 | one hundred forty | a hundred and eighty | 220 | ||
70° | Max. Belt Pace (m/s) | one.6 | one.six | 1.6 | 1.6 | one.six | one.six | |
Max. Particle Dimensions (mm) | one hundred twenty | a hundred | one hundred forty | a hundred | one hundred forty | a hundred and eighty | ||
90° | Max. Belt Pace (m/s) | 1.twenty five | one.25 | one.twenty five | one.25 | one.25 | 1.twenty five | |
Max. Particle Dimension (mm) | sixty | eighty | a hundred | eighty | one hundred | 140 |
one. What is the primary enterprise scope of your business?
HZE is a firm with R&D centre, design institute, production factories, set up and commissioning teams. Our consumers are in the mining and mineral processing fields. Our main organizations consist of mineral processing EPC (engineering, procurement and construction), venture session, engineering design, mineral processing equipment manufacturing, on-web site set up, commissioning, workers education, customer task operation administration, spare components provide and technical assist. CZPTers are cost-free to select any a single or any combination of our services.
two. What are the outstanding rewards of your organization?
The one-quit services of mineral processing engineering venture and products is our core competitiveness.
The most crucial feature that HZE distinguishes itself from other engineering companies, design and style organizations or consulting businesses is that we are also an tools manufacturer with a generation plant of 50,000 square meters, and we have comprehensive production rout and the connected products.
HZE distinguishes alone from other equipment producers by possessing its possess R&D center and engineering design and style institute.
HZE distinguishes alone from numerous mining equipment enterprises by possessing an professional group with customers including not only senior engineers of the company, but also leading Chinese complex authorities, university professors and scientists.
three. What are the traits of your firm’s 3D layout?
HZE not only uses 3D application to design and style equipment, but also makes use of 3D application to style procedure movement, pipeline, metal composition, auxiliary facilities, and many others. of the entire mineral processing task. We even use 3D design for equipment packaging, container packing and gear instructions manual. This tremendously increases the quality of products and engineering, shortens the design interval, facilitates technical dialogue and analysis, facilitates task management, enhances design security and minimizes project value.
four. What are the provider characteristics of your organization?
- CZPTers who whether or not get our gear, or entrust us with EPC, or require us to give a particular support, cooperate carefully with us to carry out certain operations and supervise our implementation all through the approach.
- HZE will try to recognize the standard situation and demands of customers as comprehensive as feasible prior to the sale, formulate a preliminary program in accordance to the particular circumstance of clients, and get unanimous views right after communications and discussions with customers to determine the strategy.
- We established up buyer data files for each client who signed the contract with us and add them to the Cloud exactly where buyers can also get an account and password. CZPTers can have all the files, films and photos, engineering, providers, execution, procedure, management and management, maintenance and so on associated to the company.
- No matter whether it is in the approach of basic contracting, gear producing or providing some kind of services, we welcome buyers to know about our implementation on the place or by way of the network, and put CZPT requirements and viewpoints.
- We assist customers who have employed our merchandise to formulate operation specs and make tips on maintenance programs and spare areas inventories. In addition to program on-website installation, commissioning and instruction, throughout the generation period of time after we handing more than equipment to customers for use, we typically understand the gear making use of scenarios through the network and provide assistance and education to client administration and operators.
- For the clientele who have just commence the mining organization, we give the chance of coaching and practice in China’s mines for the clients’ personnel, right up until they are competent in operation and routine maintenance.